Tuesday, April 30, 2013

DAY 2-CONDO RENOVATION...

DECISIONS! DECISIONS!!
More paint samples! I'm going with Sherwin Williams paint... I love the "buttery" feeling of their paint as it goes on the wall! I know, odd thing to say. But, it flows smoothly & SW didn't drip like the first samples I tested!

SHOWER PAN INSTALLED!
Dry wall has been "mudd-ed" & the shower pan has been set. The shower floor could be installed tomorrow, if everything is dry! 
SHOWER TILE
Your basic white tile! Six by six on the walls & smaller (cute stuff) will be installed on the shower floor & the inset (where you put your shampoo & cream rinse). 
STAIR CARPETING
The carpet guy brought eight samples & I picked this one BEFORE he showed me everything he brought. JPE's choice also! YEAH!

HAZARDOUS!! STAIRCASE
We are installed carpeting ONLY on the stair rungs... wrapped on the individual steps. The staircase is "L-shaped"... (this pic is looking down from landing into the living room).
FYI, this is the view LOLA gets when she visits! she loves her "perch" because she can see outside.
STAIRCASE & TOP LANDING
DON'T want anyone falling down our staircase! Carpeting will be installed on the stairs & landing. See the flat section where the ladder is standing - that's where LOLA sits!
JPE WORKING!
We're both leaving work early - so we can debrief with our job supervisor at 3:30. JPE did some work while I swept up some of the "crud" on the floors.

Other jobs completed today: crown molding & baseboard were painted. bedrooms upstairs got second coat of texture. 

Tomorrow - all ceilings get two coats of paint... molding will be cut... getting ready for installing the floors upstairs (maybe as early as Thursday?).

That's all for now! 

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...