DECISIONS! DECISIONS!! |
More paint samples! I'm going with Sherwin Williams paint... I love the "buttery" feeling of their paint as it goes on the wall! I know, odd thing to say. But, it flows smoothly & SW didn't drip like the first samples I tested!
![]() |
SHOWER PAN INSTALLED! |
Dry wall has been "mudd-ed" & the shower pan has been set. The shower floor could be installed tomorrow, if everything is dry!
![]() |
SHOWER TILE |
Your basic white tile! Six by six on the walls & smaller (cute stuff) will be installed on the shower floor & the inset (where you put your shampoo & cream rinse).
![]() |
STAIR CARPETING |
The carpet guy brought eight samples & I picked this one BEFORE he showed me everything he brought. JPE's choice also! YEAH!
![]() |
HAZARDOUS!! STAIRCASE |
We are installed carpeting ONLY on the stair rungs... wrapped on the individual steps. The staircase is "L-shaped"... (this pic is looking down from landing into the living room).
FYI, this is the view LOLA gets when she visits! she loves her "perch" because she can see outside.
![]() |
STAIRCASE & TOP LANDING |
DON'T want anyone falling down our staircase! Carpeting will be installed on the stairs & landing. See the flat section where the ladder is standing - that's where LOLA sits!
![]() |
JPE WORKING! |
We're both leaving work early - so we can debrief with our job supervisor at 3:30. JPE did some work while I swept up some of the "crud" on the floors.
Other jobs completed today: crown molding & baseboard were painted. bedrooms upstairs got second coat of texture.
Tomorrow - all ceilings get two coats of paint... molding will be cut... getting ready for installing the floors upstairs (maybe as early as Thursday?).
That's all for now!